Did you know?

Wiring Diagrams


You and your electrical contractor are responsible for installing the service entrance wiring at your home or business. Notify a Baldwin EMC customer service representative at (251) 989-6247 when your wiring is complete.

Download a wiring diagram in Adobe PDF format here. If you do not have Adobe Reader, click here for a free download. 

Single Phase Overhead Service Entrance (200 Amp or Less)
Single Phase Underground Service Entrance (200 Amp or Less)
200 Amp Meter Pole Installation
100 Amp Meter Pole Installation
60 Amp Temporary Pole Installation
3 Phase 120/240 Volt Transformer Pad Installation
3 Phase Transformer Pad Installation
C.T. Meter Can and Cabinet
C.T. Meter Can Pedestal Specs
Subdivision Transformer Placement 
Underground Policy Outline 
Underground Primary Policy Outline
Underground Subdivision Specs
Outdoor Lighting Policy Outline 

    For wiring diagrams not listed here, contact our engineering department at (251) 989-6247.

  • Summerdale (Headquarters)
    19600 State Highway 59
    Summerdale, AL 36580
    8:00 a.m. to 4:30 p.m. M-F
  • North Baldwin
    47525 Highway 59
    Bay Minette, AL 36507
    8:00 a.m. to 4:30 p.m. M-F
  • South Baldwin
    21801 University Lane
    Orange Beach, AL 36561
    8:00 a.m. to 4:30 p.m. M-F
  • Call Center:
    (251) 989-6247
    (800) 837-3374 Toll Free
    7:00 a.m. to 6:00 p.m. M-F